Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4316702 |
|---|---|
| Organisation Name | Kochi Metro Rail Limited |
| Tender Brief | Corrigendum : Design And Construction Of New Steel Roof And Brickbat Removal In Ibl Building |
| Last Date For Submission | 12th Jun, 2026 |
| Opening Date | 15 Jun, 2026 |
| Document Cost | 5900.00 |
|---|---|
| EMD | 100000.00 |
| Estimated Cost | 7796089.00 |
| City | Aluva |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Schedule A | ||
| 2 | Design: Design of the steel roof truss, including structural analysis, detailed design calculations, preparation of general arrangement drawings, connection details, bill of materials, technical specifications and comprehensive shop drawings as per relevant IS codes and standards, in accordance with the scope of work and directions of the Engineer-in-Charge. The scope also includes Detailed assessment of existing RCC terrace to determine its adequacy for new loading conditions, assessment of existing PEB/steel roof structure in IBL building and its structure interface/junctions, solar panel system, plumbing lines, and drainage system. Proof Checking : The detailed design drawings and report prepared by the design consultant shall be proof-checked by an approved third-party agency such as CUSAT/NIT, or any other equally reputed agency including submission, coordination, incorporation of comments, and obtaining final approval, complete as directed by the Engineer-in-Charge. All fees and coordination charges related to the proof-checking agency shall be included in the quoted rate. | 1.000 | Ls |
| 3 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50-200 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix | 50.000 | Cu.M |
| 4 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50-200 metres lead as per direction of Engineer-in-charge In cement mortar | 80.000 | Cu.M |
| 5 | Demolishing brick tile covering in terracing including stacking of serviceable material and disposal of unserviceable material within 50-200 metres lead. | 850.000 | Sq.Mtr |
3 Days Left