Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4219966 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repair /recarpeting To Road, Road Side Path And Road Furniture In Otm Accn Under Age B/r Ii Ge Babina |
| Last Date For Submission | 15th Jun, 2026 |
| Opening Date | 17 Jun, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 138000.00 |
| Estimated Cost | 7500000.00 |
| City | Babina |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Scarifying or picking gravelled, macadam or bituminous macadam surfaces in area not exc 400 sqm each and depth exc. 50 mm but n. exc 100 mm deep complete all as specified and directed by GE. | 15.00 | 10 Sqm |
| 2 | M&L for 75mm thick (compacted thickness) WBM, with coarse stone aggregates of grading 2 (63 to 40mm size) or of grading 3 (50 to 20mm size), spread, rolled and consolidated to gradient and camber required (of grading as specified) type of stone granite/trap /basalt and including screening with moorum, watered, consolidated and compacted each layer seperately to the required grdient and camber with 8 to 10 tonne power roller complete all as specified and directed. | 15.00 | 10 Sqm |
| 3 | M&L for preparing surfaces of un-surfaced WBM by brushing with wire brushes for removing caked mud etc. sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc, applying evenly a priming/tack coat with using paving bitumen VG-10, @ 10 kg per 10 sq metre complete all as specified and directed by GE. | 15.00 | 10 Sqm |
| 4 | M&L for Premix bituminous macadam with using paving bitumen VG-30, as 4 % of total mix laid/rolled and compacted to required gradient and camber (consolidated thickness 75mm or less) complete all as specified and directed by GE. | 50.00 | Cum |
| 5 | M&L for preparing old black top surfaces of road by brushing with wire brushes for removing caked mud etc. sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc, applying evenly a priming/tack coat with using paving bitumen VG-10 @ 5 kg per 10 sq metre complete all as specified and directed by GE. | 1300.00 | 10 Sqm |
6 Days Left