Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4342238 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Comprehensive Maintenance Works To Buildings Including Internal Br Services Inside Gtre Cda Dsc And Ge Bso Em Office Under Age Br Ii At Bangalore |
| Last Date For Submission | 15th Jun, 2026 |
| Opening Date | 17 Jun, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 98000.00 |
| Estimated Cost | 4900000.00 |
| City | Bangalore |
|---|---|
| State | Karnataka |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified and as directed | 320.00 | SQUARE METRE |
| 2 | Demolition of unreinforced cement concrete as in sub base not exc. 150 mm thickness including removing the debries from the building and upto 50m complete all as specified and as directed | 53.50 | CUBIC METRE |
| 3 | Material and labour for 100mm thick Plain Cement Concrete type D-2, (1:4:8) using 40mm graded stone aggregate as in sub base complete all as specified and as directed. | 100.00 | SQUARE METRE |
| 4 | Material and labour for 25mm thick Plain Cement Concrete type B-1, (1:2:4) using 20mm graded stone aggregate as in sub base complete all as specified and as directed. | 140.00 | SQUARE METRE |
| 5 | Providing and laying 9-10mm thick double charge vitrified tiles, polished finish of size 600 x 600 mm with water absorption less than 0.08% and conforming to IS 15622, of approved make, in all colours and shades, laid over prepared base using approved polymer modified tile adhesive conforming to IS 15477, applied with notched trowel as per manufacturer s instructions, including maintaining uniform joints using 5 mm thick PVC tile spacers, complete. The joints shall be filled and finished with approved epoxy based tile grout of matching shade, including cleaning of surface, curing where required and removal of spacers, all complete as directed by Engineer-in-Charge. | 40.00 | SQUARE METRE |
6 Days Left