Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4217898 |
|---|---|
| Organisation Name | Orissa Lift Irrigation Corporation |
| Tender Brief | Corrigendum : Installation And Engergisation Of Salagan Tw Li Project |
| Last Date For Submission | 29th May, 2026 |
| Opening Date | 30 May, 2026 |
| Document Cost | 7080.00 |
|---|---|
| EMD | 19061.00 |
| Estimated Cost | 1906120.00 |
| City | Cuttack |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in hard soil 50m initial lead & 1.5 m initial lift including rough dressing & breaking of clods to minimum 5 cm to 7 cm and laying in layers not exceeding 0.30M (1 -0 ) in depth including cost of all T&P required for the work, cost of transportation, cess, royalty etc complete except GST as per instruction of Engineer-in-Charge. | 0.731 | Cum |
| 2 | Earth work in excavation of foundation in hard soil within 50 m initial lead & 1.5 M initial lift including dressing & levelling the bed & depositing excavated materials within above lead & lift including cost of all T&P required for the work, cost of transportation, cess, royalty etc complete except GST as per instruction of Engineer-in-Charge. | 20.630 | Cum |
| 3 | Filling in F&P with excavated materials including well watered and rammed including cost of all T&P required for the work, cost of transportation, cess, royalty etc complete except GST as per instruction of Engineer-in-Charge. | 21.361 | Cum |
| 4 | Filling in F & P with sand well watered and rammedincluding cost of all materials, T&P required for the work, cost of transportation, cess, royalty etc complete except GST as per instruction of Engineer-in-Charge. | 6.478 | Cum |
| 5 | Cement concrete (1:4:8) with 4cm (1 ) size hard granite metal C.B. metal of approved quality from approved quarry with required ramming,watering and curring etc. complete including cost, royalty & convence charges of all material to work site, supply of cement ,T&P required etc. complete except GST as per the direction of the Engineer-incharge. | 3.501 | Cum |
4 Days Left