| Tender ID | 4228031 |
|---|---|
| Organisation Name | Uttar Pradesh Power Transmission Corporation Limited |
| Tender Brief | Corrigendum : Civil Work For Increasing Capacity From (2x63) Mva To (2x63 Plus 1x40) Mva Transformer With Bay At 132 Kv Substation Dph, Ghaziabad. |
| Last Date For Submission | 16th Jun, 2026 |
| Opening Date | 17 Jun, 2026 |
| Document Cost | 3540.00 |
|---|---|
| EMD | 55000.00 |
| Estimated Cost | 0.00 |
| City | Ghaziabad |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.All kinds of soil. | 115.00 | CUM |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 205.00 | CUM |
| 3 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 1.90 | CUM |
| 4 | Providing and laying in position cement concrete of specified grade 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources)excluding the cost of centering and shuttering - All work up to plinth level : | 24.00 | CUM |
| 5 | Providing and laying in position cement concrete of specified grade1:1 :3 (1 Cement: 1 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) excluding the cost of centering and shuttering - All work up to plinth level : | 26.00 | CUM |