Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Military Engineer Services
Tender ID4417360
Organisation NameMilitary Engineer Services
Tender BriefCorrigendum : Periodical Services For Otm And Md Accn In Domestic Area At Af Stn Jammu Under Ge (af) Jammu
Last Date For Submission27th Jun, 2026
Opening Date04 Jul, 2026
Cost
Document Cost500.00
EMD90000.00
Estimated Cost4500000.00
Location
CityJammu
StateJammu and Kashmir

Register to see full details

BOQ Items
#ItemQtyUnits
1M&L Prepration of old decorated surfaces of ceiling incliuding scraping of old flakes with the help of mechenical /elcterical sander ,washing down with help of water and apply one coat of white wash on surface of ceiling,necessary formwork scaffolding required upto the 6th story complete all as specified and directed by engr-in-charge..7000.00Sqm
2M&L for prepartion and scrapping down of old decoated surface of wall with mechanical/elctrical sander and washing down the surfaces with the help of water completely and apply one coat of Interior Emulsion of any tint on walls and filling gaps with putty so as to provide smooth surface,the surface shall be even and smooth,free from any undulation complete all as specified and directed by engr-in-charge.. 16800.00Sqm
3M&L for preparation of old decorated wooden surface,applying one coats of synthetic enamel paint on wooden surfaces including necessary filling material as required at site to make the surface smooth and even.complete all as spd and directed by Engr-in-charge. 5800.00Sqm
4M&L for preparation of old decorated surface of steel,applying one coats of synthetic enamel paint on steel surfaces including necessary filling material as required at site to make the surface smooth and even.complete all as spd and directed by Engr-in-charge. 4100.00Sqm
5M&L for complete removal of existing treatment on walls including preparation of old decorated surface of wall ,applying two coats of Interior Emulsion on walls over a coat of primer with mechenical sprayer followed by roller and filling gaps with putty to make surface upto desired finish as app by Eng-in-charge.complete all as spd and directed Note: Each layer of OBD shall have a gap of 08 Hrs till previous layer has dried up and work has to be executed through company employee ,before all Make and executing agencey shall have the app of GE.15800.00Sqm
27th Jun, 2026

18 Days Left

WhatsApp