| Tender ID | 4311415 |
|---|---|
| Organisation Name | Rural Engineering Department |
| Tender Brief | Corrigendum : Nagar Khetra Ke Indane Gas Godam Ke Pass Isthit Muktidham Main Shav Rakhne Ke Liye Chabutara Va Apex Karya. |
| Last Date For Submission | 30th May, 2026 |
| Opening Date | 30 May, 2026 |
| Document Cost | 854.00 |
|---|---|
| EMD | 45000.00 |
| Estimated Cost | 2247000.00 |
| City | Jhansi |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in cutting in moorum mixed soil (in Bundelkhand areas,requiring use of special T&P such as pick axes and sabbals etc) excavation to be in the form of regular pits not exceeding 1/2 meter(20") in depth including ramming and dressing the surface to required, levels and slopes and also including 1.5 m(5ft),lifts and 30m(100ft) lead The earth trom cutting to be used in making embankment or to be deposited as spoil banks within two km, distance including cost of royalty as directed by Engineer-in-charge. | 570.490 | cum |
| 2 | Providing, laying Spreading and compacting stone aggregate of specific sizes to water bound macadom specification including spreading in uniform thickness hand packing ,rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber , apploying and brooming ,stone screening to fillup the interstices of coarse aggregate ,watering and compacting to the required density Grading 3 as per technical specification class 405 | 146.870 | cum |
| 3 | Providing and laying of 80 mm interlocking concrete block pavement laid in stone dust base and fill joint with fine sand .Joint filled after lavelling and dressing base including supply of all materials ,labours,T&P etc required for proper completion of the site. | 1958.250 | Sqm |
| 4 | Supply and fixing sign board i/c letter writting all comp. | 1.000 | No. |
| 5 | Excavation in foundation in moorum mixed soil (in Bundelkhand area) including lift upto 1.5 m. and lead upto 30 m. and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge a distance of 30 m. from the foundation trenches. | 22.270 | cum |