Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Local Self Government Department
Tender ID4316740
Organisation NameLocal Self Government Department
Tender BriefCorrigendum : Ncfrw 2025 26 Ncfrw Kodungallur Municipality Vp Thuruth Sc Colony Road In Ward 26 New Ward 27 Sl No 7 General Civil Work New Ward
Last Date For Submission25th May, 2026
Opening Date25 May, 2026
Cost
Document Cost1870.00
EMD21177.00
Estimated Cost847088.00
Location
CityKodungallur
StateKerala

Register to see full details

BOQ Items
#ItemQtyUnits
1Road Retarring
2OD3264/2026-2027:Scrarifying the existing bituminous road surface to a depth of 50mm and disposal of scrarified material with in all lifts and lead upto 1km (by mechanical means300.000sqm
375.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.98.300sqm
44.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead22.500cum
575.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502300.000sqm
25th May, 2026

Ending Today

WhatsApp