Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4434156 |
|---|---|
| Organisation Name | Gurugram Metropolitan Development Authority |
| Tender Brief | Corrigendum : Construction Of Epdm Synthetic Track Over Existing Kachcha Track In Mpsj Park (leisure Valley), Sector-29, Gmda, Gurugram. (including Defect Liability-cum-maintenance Period For 1825 Days) |
| Last Date For Submission | 12th Jun, 2026 |
| Opening Date | 12 Jun, 2026 |
| Document Cost | 5000.00 |
|---|---|
| EMD | 779091.00 |
| Estimated Cost | 38954518.00 |
| City | Multi city |
|---|---|
| State | Haryana |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Laying and Jointing PVC Pipe. Heading | ||
| 2 | Supply and installation of FIBA approved and IAAF Approved Lab Tested synthetic polyurethane (PU) system for Jogging Track. The product must have 16 mm total thickness with base layer (Recycled Rubber Granules) of 8mm thickness and top layer {Ethylene Propylene Diene Monomer (EPDM)} of 8mm thickness respectively and should conform to the technical specifications: having Force Reduction between 36%-40%, Vertical Deformation 1.3-1.7mm, Permeability 0.058-0.06 cm/s, tensile strength 0.55-.0.57 N/mm2 to be laid on prepared sub base with line markings as per FIBA guidelines and as per the instructions of the Engineer In-Charge complete in all respect. Materials used should be from IAAF/WA approved manufacturer only as per below given makes/Company. (Make/Company: - Kouan ConstructionCo Ltd. (JPA)/Nippon Taiiku Shisetsu (JPN)/ Plubber Co. Ltd. (KOR)/Conica AG (SUI)/Stockmeier Urethanes (GER)/ USECHEM Co. Ltd. (KOR)/ Hasegawa Sports Facilities Co.,Ltd. (JPN)/ Herculan B.V (NED). | 6020.000 | Sqm |
| 3 | Upkeep/ Maintenance of the synthetic polyurethane (PU) system for Jogging Track through deployment 02 Nos manpower (each day) and machine. Routine inspection like removal of debris, objects, metal, etc. from Walking/Jogging Track. One time a month dry cleaning by blower and Water Cleaning by using water jet Four times a year. minor repair work of jogging track (synthetic material should be inclusive). For 01st year | 12.000 | Per Month |
| 4 | Upkeep/ Maintenance of the synthetic polyurethane (PU) system for Jogging Track through deployment 02 Nos manpower (each day) and machine. Routine inspection like removal of debris, objects, metal, etc. from Walking/Jogging Track. One time a month dry cleaning by blower and Water Cleaning by using water jet Four times a year. minor repair work of jogging track (synthetic material should be inclusive. For 02nd year | 12.000 | Per Month |
| 5 | Upkeep/ Maintenance of the synthetic polyurethane (PU) system for Jogging Track through deployment 02 Nos manpower (each day) and machine. Routine inspection like removal of debris, objects, metal, etc. from Walking/Jogging Track. One time a month dry cleaning by blower and Water Cleaning by using water jet Four times a year. minor repair work of jogging track (synthetic material should be inclusive. For 03rd year | 12.000 | Per Month |
3 Days Left