Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3800209 |
|---|---|
| Organisation Name | Municipal Corporation |
| Tender Brief | Lohamandi Zone, Room No. 18 Residual Repair Work For The Ambedkar Bhawan Located At Namak Ki Mandi. |
| Last Date For Submission | 28th Mar, 2026 |
| Opening Date | 28 Mar, 2026 |
| Document Cost | 590.00 |
|---|---|
| EMD | 84322.00 |
| Estimated Cost | 843220.00 |
| City | Agra |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in foundation in ordinary Soil (Loam, Cley or sand) including, lift up to 1.50 M and lead up to 30 M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge up to a distance of 30 M form the foundation trenches. (SI No. 251) | 25.92 | CUM |
| 2 | Providing and laying cement concrete in 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) and curing complete, including cost of form work in foundation and floors. (DSR SN-4.1.10) | 3.34 | cum |
| 3 | R.C.C. work Providing and laying in position specified grade of R.C.C. Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement. All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) (Chapter 5 S.I. No. 5.1.4) | 15.45 | cum |
| 4 | Renforced cement concrete work in beams, suspended floors, roofs having balconies, shelves, chajjas, bands, staircases and spiral stair cases above plinth, level up to floor five level, including cost of centering, shuttering, Finishing and Reinforceement with 1:1 :3 {1 cement : 1 coarse sand (zone-III): 3 graded stone} | 22.28 | cum |
| 5 | Mild Steel or iron in plain work such as reinforced concrete or reinforced brick work (When not included in and an overall rates) brought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level. (10 mm to 12mm tor (TMT Bars). | 17.49 | qtl |
4 Days Left