| 1 | Boring holes 3.5 m deep in ordinary soil (for cast in situ piles) and getting out the soil and disposal of the surplus excavated soil as directed within all lead and lift including dewatering if required at cost and risk of agency for following diameter of pipes.(iii) 300 mm (depth as per drawing) | 2800.000 | Each |
| 2 | Add to or deduct from the rate for Bore Holes of 3.5 m Depth as per it no.1, if bore holes are made deeper or shallower than 3.5M. for Piles of following diameter.(iii) 300 mm (depth as per drawing) | 2800.000 | Each |
| 3 | Earthwork in excavation by mechanical means (All type of soil) for foundation, footings, walls, retaining walls, rafts, trenches, drains, lift pits, underground sumps, tank, septic tanks, soak well, Box cutting etc. including dewatering the sub-soil water from any source and rain water to keep the excavation dry, removal of slush, dressing of sides and ramming of bottoms, planking, shoring & strutting, removal & disposal of surplus excavated material with all lead & lift. including compaction by using mechanical plate compactor / vibro roller, finished to desire levels all as per excavation plan and foundation drawings to get Modified Proctor Density test (MPD) of 95Percentage., work including mechanical transport inclusive of royalty, statutory fees all permissions & any other incidental expenses etc. complete. i) Up to 1.5 Mtr Depth | 10360.000 | Cu.mt |
| 4 | Filling available excavated earth in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering. Rate to include cost of compaction to achieve at least 95Percentage Proctor Density of refilled excavated earth.Work shall complete as per the instruction of EIC. work complete including all type of tools, tackles, scaffolding, safety measures, loading, unloading, transportation, at all floors, all heights, all levels etc complete as per instruction of Architect/EIC. | 4620.000 | Cu.mt |
| 5 | Earth Filling with murrum or approved quality earth in below flooring, sides of foundation, retaining wall, trenches, lift pits elsewhere directed in layers of not exceeding 150 mm thick including breaking clods, watering, compacting each layer with vibratory compactor and at inaccessible places with wooden/steel rammers to achieve 90-95Percentage proctor density at optimum moisture content, all leads & lifts. Bailing/pumping out of water to keep site dry while back filling ,Cost shall include conveyance of all materials, labor, machinery etc. complete(only good yellow soil/ muurum to be used for filling) Work shall complete as per the instruction of EIC. work complete including all type of tools, tackles, scaffolding, safety measures, loading, unloading, transportation, at all floors, all heights, all levels etc complete as per instruction of Architect/EIC. | 5320.000 | Cu.mt |