Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3401897 |
|---|---|
| Organisation Name | INKEL Limited |
| Tender Brief | Corrigendum : Development Of Taluk Head Quarters Hospital Pulinkunnu, Alappuzha |
| Last Date For Submission | 30th Mar, 2026 |
| Opening Date | 31 Mar, 2026 |
| Document Cost | 17700.00 |
|---|---|
| EMD | 500000.00 |
| Estimated Cost | 852469277.00 |
| City | Alappuzha |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | CIVIL WORKS Pile Foundation | ||
| 2 | Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of grade M -35 (Min Cement quantity -400kg/m3 and no payment shall be made for extra cement) of specified diameter and length below pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by Crawler mounted, telescopic boom hydraulic pilling Rig all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured up to bottom of pile cap). Note: Truck Mounted rotary/TMR/Tube well boring machine shall not be used.600 mm dia piles | 2576.400 | Metre |
| 3 | Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of grade M -35 (Min Cement quantity -400kg/m3 and no payment shall be made for extra cement) of specified diameter and length below pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by Crawler mounted, telescopic boom hydraulic pilling Rig all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured up to bottom of pile cap). Note: Truck Mounted rotary/TMR/Tube well boring machine shall not be used.700 mm dia piles | 6741.900 | Metre |
| 4 | Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of grade M -35 (Min Cement quantity -400kg/m3 and no payment shall be made for extra cement) of specified diameter and length below pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by Crawler mounted, telescopic boom hydraulic pilling Rig all complete,including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured up to bottom of pile cap). Note: Truck Mounted rotary/TMR/Tube well boring machine shall not be used.800 mm dia piles | 5335.200 | Metre |
| 5 | Vertical load testing of piles in accordance with IS 2911( Part IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of engineer -in-Charge. Single pile 137 tonne capacity. Initial test (For 600mm dia) | 1.000 | Per test |
10 Days Left