Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3799967 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Construction Of 1 Rooms And Hall At Govt. Sr. Sec. School Bheegota |
| Last Date For Submission | 31st Mar, 2026 |
| Opening Date | 01 Apr, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 15340.00 |
| Estimated Cost | 767000.00 |
| City | Alwar |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed : All kinds of soil | 33.400 | Cum |
| 2 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M10 grade Nominal Mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size). | 3.327 | Cum |
| 3 | Providing and laying in position specified grade of cement concrete for RCC structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement for Arches, arch ribs, domes, vaults, shells, folded plate, chimneys, shafts , roofs having slope more than 15 ,vertical and horizontal fins individually or forming box louvers, facias and eaves boards M20 grade Nominal Mix / Design Mix | 28.950 | Cum |
| 4 | Add extra for providing richer mixes respectively at all floor levelsProviding M-25 grade concrete by using cement as per codal provision instead of M-20 grade design mix. | 17.010 | Cum |
| 5 | Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. ('Original producers' who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786) | 3090.410 | Kg. |
7 Days Left