Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Works Department
Tender ID3635078
Organisation NamePublic Works Department
Tender BriefCorrigendum : Construction Of Various Class Room In Govt Schools Under Dmft Scheme Package No Rj-07-49 Dmft Building Asind 2025-26
Last Date For Submission23rd Mar, 2026
Opening Date24 Mar, 2026
Cost
Document Cost500.00
EMD76340.00
Estimated Cost3817000.00
Location
CityAsind
StateRajasthan

Register to see full details

BOQ Items
#ItemQtyUnits
1PART A" GSSS BABRANA Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils261.06CUM
2Providing and laying in position cement concrete including curing compaction etc. complete in spcified grade excluding the cost of centering and shuttering all work upto plinth level 1:4:8(1 cement:4 Coarse sand :8 graded stone aggregate 40 mm nominal size).31.26CUM
3Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for foundation, footings, strap beam, raft, base of column etc197.45SQM
4Steel Reinforcement:-P/F reinforcement for RCC work including straightening,cutting, bending, placing in position and binding (including cost of binding wire) all complete upto floor five level ('Original producers' who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786) Thermo-mechanically Treated bars (Conforming of relevent IS code)12518.04KG.
5Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. M20 grade Nominal Mix / Design Mix51.17CUM
23rd Mar, 2026

4 Days Left