Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3776483 |
|---|---|
| Organisation Name | Uttar Pradesh Projects Corporation Limited |
| Tender Brief | Construction Of Skill Development Hub And Incubation Cell At Dr. Rml Awadh University Ayodhya |
| Last Date For Submission | 27th Mar, 2026 |
| Opening Date | 27 Mar, 2026 |
| Document Cost | 17700.00 |
|---|---|
| EMD | 3194000.00 |
| Estimated Cost | 159657000.00 |
| City | Ayodhya |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | [ PART A ] Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches. | 2229.10 | CUM |
| 2 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 2949.47 | CUM |
| 3 | Providing and laying in position ready mixed or site batched design mix cementconcrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/ Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the minimum specified cement content, the contractor shall have discretion to eithe.r re-design the mix or bear the cost of extra cement. Concrete of M10 grade with minimum cement content of 220 kg /cum | 366.77 | CUM |
| 4 | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 kms. from the site of work and including watering, dressing etc rate to include cost of all materials labour T & P etc required for proper completion of work. | 350.10 | CUM |
| 5 | Construction of drain along with apron. 150X150MM | 345.62 | RM |