Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Works Roads Department
Tender ID3521665
Organisation NamePublic Works Roads Department
Tender BriefCorrigendum : Construction Of Bridge In Baksa District I) Br. No. 1/1 On Nh-31 To Dipta Package No. Ce/eap/arrbp/ocb/bridge-1/baksa/12
Last Date For Submission24th Mar, 2026
Opening Date24 Mar, 2026
Cost
Document Cost3000.00
EMD294000.00
Estimated Cost14719000.00
Location
CityBaksa
StateAssam

Register to see full details

BOQ Items
#ItemQtyUnits
1Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150mm in thickness as per Technical Specification Clause 201. By Mechnaical means In area of non-thorny jungle i) Bridge No 1/1 on NH-31 to Dipta0.152Ha
2Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment, including trimming bottom and side slopes in accrodance with requirements of lines, grades and cross-sections. i) Bridge No 1/1 on NH-31 to Dipta300.094Cum
3Construction of embankment with approved material obtained from borrow pits with all lift, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with all lead as per Technical Specification Clause 301.5 i. Private Land i) Bridge No 1/1 on NH-31 to Dipta1968.540Cum
4Construction of subgrade and earthen shoulder with approved material obtained from borrow pits with all lifts, transporting to site, spreaing, grading to required slope and compacted to meet requirement of Table 300.2 with all lead as per Technical Specification Clause 303.1 i. Private Land i) Bridge No 1/1 on NH-31 to Dipta550.709Cum
5Construction of granular sub-base by providing well grade material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. For Grading II Material i) Bridge No 1/1 on NH-31 to Dipta220.294Cum
24th Mar, 2026

4 Days Left