Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3488290 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repairs And Maintenance Of Certain Roads, Berms, Road Shoulders, Kerbs And Road Furniture At Avrious Md Accn Areas Of Afs Jalahalli East Area Under Ge (m) (af) Jalahalli |
| Last Date For Submission | 31st Mar, 2026 |
| Opening Date | 07 Apr, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 142000.00 |
| Estimated Cost | 7800000.00 |
| City | Bangalore |
|---|---|
| State | Karnataka |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Material and labour for kerb stone precast Plain Cement concrte (1:2:4) type B1 using 20 mm graded finished even and fair without using extra cement and all as specified and directed and Demolition of old Kerb Stone (Un Reinforced) of any description and in any position not otherwise specifically provided complete all as specified and directed. | 2.50 | CUM |
| 2 | Material and Labour for prepration of new surface of concrte or brick or stone surfaces etc of any description exceeding 10 cm width or girth and over a coat of primer applying two coat of synthetic eneamel paint complete all as specified and directed. | 85.00 | SQM |
| 3 | Material & Labour for 75 mm thick WBM with coarse agg of grading 2 (63 to 40mm) or of grading 3 (50 to 20mm), rolled and consolidated to gradient and camber required with granite trap or basalt complete all as specified and as directed | 52.00 | 10 SQM |
| 4 | Preparing surface of unsurfaced water bound macadam by brushing with wire brushes for removing caked mud etc, sweeping with brooms and finally fanning the cleaned surfaces with gunny bags to remove all loose dirt etc complete all as specified and as directed | 70.00 | 10 SQM |
| 5 | Preparing surface of black top surfaces by burshes for removing caked mud etc, sweeping with brooms and finally fanning the cleaned surfaces with air compressor to remove all loose dirt etc,complete all as specified and as directed. | 1990.00 | 10 SQM |
6 Days Left