Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Pradhan Mantri Gram Sadak Yojana
Tender ID3673025
Organisation NamePradhan Mantri Gram Sadak Yojana
Tender BriefCorrigendum : Permenant Restoration Of Road From Balhama To Braman_package No.jk03_08
Last Date For Submission25th Mar, 2026
Opening Date27 Mar, 2026
Cost
Document Cost1100.00
EMD60000.00
Estimated Cost3000000.00
Location
CityBaramulla
StateJammu and Kashmir

Register to see full details

BOQ Items
#ItemQtyUnits
1PCC Drain
2Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:All kinds of soil. 92.53cum
3Type B (First class bedding) Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii) including cost and carriage of all materials from approved source to site of work, with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete)17.625cum
4Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) M-10 grade including cost and carriage of all materials from approved source to site of work, with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete)13.22cum
5Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) M-15 grade including cost and carriage of all materials from approved source to site of work, with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete)47.590cum
25th Mar, 2026

1 Days Left