Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3191650 |
|---|---|
| Organisation Name | Irrigation And Waterways Department |
| Tender Brief | Corrigendum : Bank Protection Work Along Right Bank Of River Hooghly For A Length Of 60.0 M Near Bauria Ferry Ghat Ward No 4 Of Uluberia Municipality P.s Bauria District Howrah |
| Last Date For Submission | 1st Apr, 2026 |
| Opening Date | 07 Apr, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 439257.00 |
| Estimated Cost | 21962841.00 |
| City | Bardhaman |
|---|---|
| State | West Bengal |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed. 15.0 cm av. Diameter | 605.000 | METRE |
| 2 | Labour for driving Jhaw / Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles. 15.0 cm av. Diameter | 568.700 | METRE |
| 3 | Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge . In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means upto 3 m depth Without pumping out water but including shoring as required | 132.183 | CUM |
| 4 | Supply of different materials as per approved specification. Brick Bats & stacked at site. Brick Bats. | 90.622 | CUM |
| 5 | Labour charge for dumping / laying of Laterite / Stone Boulders / Shingles / Brick Bats, from stack of worksite with all leads and lifts in water or spreading the same on the slope of the bank of River/Sea or the slope of the embankment or in the River/ Sea bed to an uniform thickness as per direction of the Engineer-in-charge including cost of all accessories and other incidental charges. Brick Bats | 90.622 | CUM |
12 Days Left