Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Military Engineer Services
Tender ID3085856
Organisation NameMilitary Engineer Services
Tender BriefCorrigendum : Provn Of Smart Meters With Prepaid Features In Lieu Of Old Meters At Bareilly
Last Date For Submission21st Mar, 2026
Opening Date28 Mar, 2026
Cost
Document Cost2000.00
EMD372300.00
Estimated Cost21856000.00
Location
CityBareilly
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Taking down electric meter and disconnecting, removing to GE East (E/M) store yard for keeping in safe custody for BER board and making good the disturbed surface of walls, floor. filling up of holes, plastening while washing distempering etc matching to the existing etc. complete all as specified and directed1689.000Each
2Design, supply installation testing, commissioning & integration of Advance Metering Infrastructure (AMI) for Bareilly station under GE (East) Bareilly comprising of Performing site survey and deciding the communication technology to ensure data availability/ connectivity of all the consumers. The design should be in such a way that it must include atleast three different makes of smart meters not more than 33% meters of each make must be installed at site: It will include the following components:
3Supply installation testing & commissioning of Smart Prepaid Energy Meters, Complying to BIS-16444, ISI Marked in existing Meter Board/ Floor Panels, current range 10-60 Amp, 240 V, accuracy class 1.0 UC1 category and above along with in built load control switch, containing provision for TOD & RTC, capable to define mulgtiple gtanff slabs incl meter boxes for Bareilly station under GE (East) Bareilly complete all as specified and directed. (a) Single phase ,2 wire, AC Static Direct connected : 1581 (b) Three phase ,4 wire, AC Static Direct connected : 108 Meter should support the following data:- (i) 15/30 min instantaneous data for voltage, current power factor, cumulative energy and frequency, daily and monthly billing survey for Cumulative Energy and Max Demand. (ii) Meter should have connect/ disconnect functionality operable for mdm/ billing software and prepaid features would be operable for MDM/ Billing end as per IS 15959 part 2. (iii) Meter should support communication protocol through RF/4G/NB IOT with the software all as required at site and directed. In case of RF communication, the cost of DCU and repeaters are deemed to be included in the rates quoted for meters. (iv) The meter should support open communication protocol DLMS with the software.1.000Each Job
4Note (i) The defect liability period will be 2 years from the date of completion of Phase-I. (ii) Any variaiton in quantity of Smart Prepaid Meter (AMI) will be paid and deducted as per the supplementary rate for single and 3 phase smart meter beyond the qunatity mentioned here-in-before as per rates given below:- (a) Single Phase meter - Rs 6838/- per meter. (b) Three phase meter Rs 8135/- per meter. (iii) The rent and water supply bill and any other charges or levy will be included in software as directed by GE.
5Supply and configuration of the web based software for three phase 440 volt and single phase 220 volt smart prepaid meter with fwg modules:- (i) Meter Data Management Module The meter data management module would be responsible for collecting the data from concentrator and make the data available to the billing system. the meter data management system would capture and provide the fwg data:- (a) Real Time Energy monitoring with 15-30 min instantaneous data from all the meters for seven parameters- Cumulative Energy, Cumulative Apparent Energy (as applicable), Power, Current, Voltage, Power Factor and Frequency. (b) Monthly billing survey data for Cummulative energy and max demand. (ii) Postpaid/ Prepaid Billing module The billing module would collect the data from the meter data management module, calculate the energy consumption, calculate billing determinant and make energy data/ billing data available to admin and end users. The biling module would include functionalities for tariff setup, bill format setup, bill adjustment, occupation billing and vacation billing. It would allow postpaid and prepaid functionality as required.1689.000Each Meter
21st Mar, 2026

17 Days Left