Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3775893 |
|---|---|
| Organisation Name | Urban Improvement Trust |
| Tender Brief | Widening And Devlopment Of Road From Saras Chauraha To Bda Office Chauraha At Bhratpur. |
| Last Date For Submission | 9th Apr, 2026 |
| Opening Date | 10 Apr, 2026 |
| Document Cost | 2500.00 |
|---|---|
| EMD | 1784460.00 |
| Estimated Cost | 89223000.00 |
| City | Bharatpur |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantling of Flexible PavementsDismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202By By Manual Means Bituminous Courses | 770.96 | Cum |
| 2 | Dismantling of Flexible PavementsDismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202By By Manual Means Granular Courses | 1419.69 | Cum |
| 3 | Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per MoRTH Specification Clause 202. Manual Means Cement Concrete | 396.00 | Cum |
| 4 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per MoRTH Specification Clause 202.. Rubble Stone Masonry in Cement Mortar | 1840.00 | Cum |
| 5 | Dismantling of Cement Concrete Pavements as per MoRTH Specification Clause 202.Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately | 1962.78 | Cum |
20 Days Left