| 1 | Supply and fixing in replacement mechanical laundry shaft including 'o' ring bearing seal, opening of laundry drum and refixing it after repair/replacement of laundry shaft with bearings, greasing and 'o' ring bearing seal complete as specified and as directed. | 1.00 | Each Job |
| 2 | Comprehensive preventive and periodical maintenance of electric passenger Lift No. 01 of OMEX make lift in G+3 storey in reliably safe and efficient operating condition by regularly examine, lubricating and adjust the equipment and carry out planned maintenance in a systematic and controlled manner of one No 15 passenger lift capacity 1020 Kg speed 1 m/s equipped with microprocessor based AC variable voltage variable frequency controller, AC Motor governor ropes driving sleave, travelling cable working and electric fitting, microprocessor card, rectifier card, controller AC drive, door drive, indication card, SMPS luminous card and hall button and landing door shoe car guide shoe landing, CWT guide shoe landing, transformer, motor bush hooter, FP Card door hanger roller, door sensor, complete all as specified and as directed. | 4.00 | Per Three Months |
| 3 | Comprehensive preventive and periodical maintenance of electric passenger Lift No. 02 of OMEX make lift in G+3 storey in reliably safe and efficient operating condition by regularly examine, lubricating and adjust the equipment and carry out planned maintenance in a systematic and controlled manner of one No 15 passenger lift capacity 1020 Kg speed 1 m/s equipped with microprocessor based AC variable voltage variable frequency controller, AC Motor governor ropes driving sleave, travelling cable working and electric fitting, microprocessor card, rectifier card, controller AC drive, door drive, indication card, SMPS luminous card and hall button and landing door shoe car guide shoe landing, CWT guide shoe landing, transformer, motor bush hooter, FP Card door hanger roller, door sensor, complete all as specified and as directed.
| 4.00 | Per Three Months |
| 4 | Comprehensive preventive and periodical maintenance of electric passenger Lift No. 03 of OMEX make lift in G+3 storey in reliably safe and efficient operating condition by regularly examine, lubricating and adjust the equipment and carry out planned maintenance in a systematic and controlled manner of one No 13 passenger lift capacity 884 Kg speed 1 m/s equipped with microprocessor based AC variable voltage variable frequency controller, AC Motor governor ropes driving sleave, travelling cable working and electric fitting, microprocessor card, rectifier card, controller AC drive, door drive, indication card, SMPS luminous card and hall button and landing door shoe car guide shoe landing, CWT guide shoe landing, transformer, motor bush hooter, FP Card door hanger roller, door sensor, complete all as specified and as directed.
Notes for Item 2 to 4:- (a) (i) Labour component required for the replacement of unserviceable parts shall be deemed to be included in the unit rate quoted against this item. (ii) Major parts (as required) shall be measured and paid separately under appropriate items of this Sch 'A'. (iii) T&P for replacement of minor/major parts will be arranged by the contractor and the cost thereof shall be deemed to be included in the unit rate quoted against this item. (iv) Contractor shall be fully responsible for full and noise less functioning of lift 24x7 days. (v) Each Job shall be considered for 03 Months.
(b) The above maintenance shall be done through only E-in-C's Branch approved OEM rep or authorised rep or authorised agent of OEM i.e M/S Kone India, M/S Schindier India Pvt Ltd., M/S Kinetic hyundai Elevator & movement tech Ltd., M/S Hitachi Lifts India Pvt Ltd, M/S Mitsubishi Elevator India Pvt Ltd, M/S Otis Elevator Company India Ltd, M/S Fujitech India Pvt Ltd, M/S Johnson Lifts Pvt Ltd, M/S Thyssenkurupp Elevator India Pvt Ltd. M/S Omega Elevators, M/S Escon Elevators Pvt Ltd, M/S LT Elevators Pvt Ltd and M/S IES Elevators or any other OEM approved by E-in-C's Branch. | 4.00 | Per Three Months |
| 5 | Notes for Serial item No. 2.00 to 4.00 :- (i) As per OEM (Original Equipment Manufacturer) generated inspection report shall be submitted immediately after conclusion of contract and then at a frequancy of three months by the contractor. (ii) All repairs, overhauling, requirement of spares for repair/replacement under this contract shall be based on inspection report genereated by OEM. (iii) If lift is not operational/break down for period more than 2 days for minor repairs or beyond seven days for major repairs than a penalty @ Rs. 1000/- per day shall be levied on contractor. The offload and onload date and time of breakdown shall be obtained from users. (iv) Regarding the breakdown is major or minor, same shall be decided by GE and the decision of GE in this regard shall be final and binding. | | |