Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3674501 |
|---|---|
| Organisation Name | Pradhan Mantri Gram Sadak Yojana |
| Tender Brief | Corrigendum : Construction Of 36 Mtr Span Single Lane Through Type Steel Motorable Bridge In Km 13th At Rd 12/800 To 12/850 On L032 Hansa To Bhollari Pkg Nojk07-192 |
| Last Date For Submission | 30th Mar, 2026 |
| Opening Date | 31 Mar, 2026 |
| Document Cost | 600.00 |
|---|---|
| EMD | 50000.00 |
| Estimated Cost | 2500000.00 |
| City | Billawar |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres, as directed by Engineer-in-Charge. All kind of Soil | 198.50 | Cum |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 24.90 | Cum |
| 3 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with. 4.5.5 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 123.63 | Cum |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. | 240.75 | Cum |
| 5 | Dumping stone including cost of stones in Horizontal on level | 11.04 | Cum |
5 Days Left