Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3508289 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Ge Chd T 98 2025 26 Special Repairs Of Building No P-192 And 193 Including Seepage And Leakage At Military Station Nahan Under Ge Chandigarh |
| Last Date For Submission | 25th Mar, 2026 |
| Opening Date | 27 Mar, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 9548000.00 |
| Estimated Cost | 4774000.00 |
| City | Chandigarh |
|---|---|
| State | Chandigarh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Taking down Cement plaster or cement lime plaster on brick or stone walls including raking out joints, hacking for key & scrubbing down with water etc complete including disposal of unserviceable rubbish outside cantt area all as specified and directed by Engineer-in-Charge. | 1843.92 | SQUARE METRE |
| 2 | Demolition of cement concrete (reinforced) (reinforcement cut as required to facilitate demolition) as in roofs, floors (other than ground floors) beams, slabs, staircases, landing, chajjas and similar suspended work complete including disposal of unserviceable rubbish outside cantt area all as specified and directed by Engineer-in-Charge. | 1.50 | CUBIC METRE |
| 3 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises complete including disposal of unserviceable rubbish outside cantt area all as specified and directed by Engineer-in-Charge. | 600.00 | SQUARE METRE |
| 4 | Taking down chowkhats or frames n.exc 1.5 sqm each (without taking off shutter from the frame) and removing from the site including dismantling brick work of hold fasts complete all as specified and directed by Engineer-in-Charge. | 58.00 | EACH |
| 5 | Taking down chowkhats or frames exc 1.5 sqm but n.exc 4 sqm each (without taking off shutter from the frame) and removing from the site including dismantling brick work of hold fasts etc complete all as specified and directed by Engineer-in-Charge. | 18.00 | EACH |
6 Days Left