Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3490510 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Ge(u)/chm-67/2025-26 Provn Of Store Room Modular Office Space At Qm Office Overhead Shed In Front Of Bio Medical Waste Unit Upgrading Of Utility Service At Rahat Guest House Interlocking Tiles At Cmdc (wc) Addn/altn Of Gurudwara At Ch Under Ge U Chm |
| Last Date For Submission | 26th Mar, 2026 |
| Opening Date | 30 Mar, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 88100.00 |
| Estimated Cost | 4402000.00 |
| City | Chandimandir |
|---|---|
| State | Haryana |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavating in trenches, not exceeding 1.5m wide and not exceeding 1.5m in depth, for foundations etc or manholes, cesspits, pipes and cables etc. not exc 10 Sqm on plan and getting out in any type of soil all as specified and directed by Engineer - in - Charge. | 160.72 | Cum |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/ in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out in any kind of soil the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | 10.00 | Cum |
| 3 | Excavating in post holes (or similar holes) each not exceeding 0.5 cum, getting out, returning, filling in and ramming earth, in layers not exceeding 25cm, watering, and removing surplus spoil to a distance not exceeding 50m and making good surface all as specified and directed by Engineer - in - Charge. | 20.00 | Each |
| 4 | Returning, filling in, including spreading, levelling, watering and well ramming in layers of soft / loose soil not exceeding 25cm thick all as specified and directed by Engineer - in - Charge. | 109.18 | Cum |
| 5 | Removal of excavated material to a distance not exceeding 50m and depositing where directed at a level not exceeding 1.5m above the starting point all as specified and directed by Engineer - in - Charge. | 154.54 | Cum |
6 Days Left