| Tender ID | 3069919 |
|---|---|
| Organisation Name | Electricity Department |
| Tender Brief | Corrigendum : Renovation Of Toilet Block Of Div Vii Office Building At Curchorem Goa |
| Last Date For Submission | 16th Mar, 2026 |
| Opening Date | 17 Mar, 2026 |
| Document Cost | 3000.00 |
|---|---|
| EMD | 15508.00 |
| Estimated Cost | 775375.00 |
| City | Curchorem |
|---|---|
| State | Goa |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Demolishing brick work in cement mortar including stacking of serviceable material & disposal of unserviceable material within 50 mts. lead. | 0.60 | cu.m |
| 2 | Dismantling the tile work in floors and roofs laid in cement including stacking of materials within 50 meters lead for thickness of tiles 10mm to 25mm. | 124.46 | sq.m |
| 3 | Demolishing cement concrete 1:3:6 or richer mix including disposal of material within 50 m lead. | 5.15 | cu.m |
| 4 | Dismantling doors, windows and clearestory windows (steel or wood) shutters including chowkhats architrave holdfast etc. complete and staking within 50 mt. Lead. a) Of area 3 sq.m. and below | 7.00 | each |
| 5 | Providing water proofing treatment over the new R.C.C. roofs terrace toilet by spreading cement slurry over the R.C.C. slab and laying of 10cms. Average laterite stone ballast coba with the necessary gradient for easy flow of rain water and the coba in covered with damp proof of Hindustan water proofing co. Or equivalent jointless water proofing plaster of mix 1:3 ( 1 cement : 3 find sand), finished smooth with wooden trowel with false marking of 30 cms square. The vertical surface of the adjoining walls are to be treated upto a height of 30cms including rounding of junction (the rate includes for complete items including labour and materials and including cost of initial treatment of roof slab as follows. The injunction of damp proof or equivalent compound with cement solution will be given as and when found necessary for filling honey comb, cracks etc. in the R.C.C. slabs). NOTE: cement consumption 25 kg/sq.m. | 64.11 | sq.m |