Tendering Authority: Gorkhaland Territorial Administration
Tender ID3073749
Organisation NameGorkhaland Territorial Administration
Tender BriefCorrigendum : State Disaster Pesponse Fund (25/a,b And C /sdrf)
Last Date For Submission27th Mar, 2026
Opening Date30 Mar, 2026
Cost
Document Cost0.00
EMD470485.00
Estimated Cost23524239.00
Location
CityDarjeeling
StateWest Bengal

Register to see full details

BOQ Items
#ItemQtyUnits
125 (a) Road Lower Division Bahadur Gaon to Simol Dara . Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge . I. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means. a) upto 3 m depth (iv) Without pumping out water and shoring100.890cum
2Plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any. (i) (1:3:6) proportion785.104cum
3Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, cross drain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.745.850Sqm
4Providing weep holes in Brick masonry / Plain / Reinforced concrete abutment, wing wall / return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and Technical specifications.327.000Each
5Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification. A) Granular material317.440cum