Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3594185 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Special Repair To Raod Near Mechanical Laundry At Ima Dehradun |
| Last Date For Submission | 26th Mar, 2026 |
| Opening Date | 28 Mar, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 77620.00 |
| Estimated Cost | 3881000.00 |
| City | DEHRADUN |
|---|---|
| State | Uttarakhand |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | M&L for removing herbs, grasses, plant roots from surfaces of roads and berms completely spraying a coat of approved branded herbisides chemicl emulsion 100 EC @1.0 ltit per ten sqm area or as per manufacturer's instructions to stop the further groth of grasses etc including all preventive measure for spraying and removal of debries to a distance of 50 meters and depositing where directed. | 100.00 | XSqm |
| 2 | M&L for scarifing or picking gravelled, macadam or bituminous macadam surfaces in area exc 400 Sqm and depth exc 50 mm but not exc100 mm complete all as specified and directed. | 100.00 | X Sqm |
| 3 | Surface excavation not exc 30 cm deep and averaging 15 cm deep and getting out in any type of soil complete all as specified and directed. | 500.00 | Sqm |
| 4 | M&L for soling (for sub base) with broken boulders or quarried stone, interstices filled, surfaces formed and rolled and consolidated to required gradient and camber, spread thickness 150mm complete all as specified and directed. | 20.00 | XSqm |
| 5 | M&L for laying and compacting 75mm thick (compacted thickness) wet mix macadam (WMM), grading as per table 400-13 of MoRTH specification for road and bridge works 2013 manufactured in WMM plant, material comprising of clean crushed, graded aggregate and granular material premixed with water to a dense mass spreading with sensor paver and rolling with vibratory roller of capacity 80-100 KN static weight and consolidating to required gradient and camber complete all as specified and directed. The finished surface tolerance to be as per Table 900-1 of MoRTH specification for road and bridge works 2013 | 100.00 | XSqm |
6 Days Left