Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3204013 |
|---|---|
| Organisation Name | Pradhan Mantri Gram Sadak Yojana |
| Tender Brief | Corrigendum : Ut01452 L060-km 04 Of Asgoli Paithani Mr To Paithani Motor Road, Length 5.62 Km. Stage-i And Ii |
| Last Date For Submission | 24th Mar, 2026 |
| Opening Date | 24 Mar, 2026 |
| Document Cost | 5900.00 |
|---|---|
| EMD | 1549000.00 |
| Estimated Cost | 77463000.00 |
| City | DEHRADUN |
|---|---|
| State | Uttarakhand |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in hill road (hill side cutting):- Excavation in hilly area for construction of road in all types of soils, rocks & E&B etc. As met at site true to lines as per plan, L section cross slope, super elevation as required also including uprooting & cutting of bushes dressing of road surface to the required level and slopes with all lift & lead, required for safe disposal of surplus excavated material at suitable dumping places indicated in the drawing by mechanical means/ manual means and including construction of required coolie walling of minimum height of 0.60 mt with the stone available from the required hill side cutting for retaining of the muck , without damaging forest , forest land , utility and private properties ,including slip clearance and its safe disposal (same as per mentioned above for safe disposal of surplus excavated material ), till the completion of the work as per part II special conditions of contract , MORD Specification Clause 1601, 1602 & 1603 and as directed by Engineer-in-charge. | 1.00 | Job |
| 2 | PROTECTION WORK | ||
| 3 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer- in- charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction | 1194.74 | Cum. |
| 4 | Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Random rubble masonry In cement mortar (1:5) | 1388.65 | Cum. |
| 5 | Random Rubble Masonry laid dry in breast wall, retaining wall, parapets, scupper etc. Including supply of all materials, labour, t & p & royalty etc, required for proper completion of work. MORD specifications) | 1949.01 | Cum. |
10 Days Left