Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3778938 |
|---|---|
| Organisation Name | Irrigation And Flood Control Department |
| Tender Brief | Demolishing Of Single Storey Balmiki Chaupal And Re-construction Of Triple Storey Balmiki Chaupal At Ambedkar Nagar Village Haiderpur, Shalimar Bagh, Ac-14 |
| Last Date For Submission | 27th Mar, 2026 |
| Opening Date | 27 Mar, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 262501.00 |
| Estimated Cost | 13125067.00 |
| City | Delhi |
|---|---|
| State | Delhi |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. All kinds of soil. | 54.00 | Cubic Metre |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m. All Kinds of soil. | 75.00 | Cubic Metre |
| 3 | Excavating trenches by mechinical / manual means of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, for all depth, including letting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m - All kinds of soil - Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia | 6.00 | Metre |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc, in layers not exceeding 20cm. in depth; consolidating each deposited layer by ramming and watering, lead up to 50m and lift upto 1.5m | 135.00 | Cubic Metre |
| 5 | Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials - All kinds of soil | 115.00 | Cubic Metre |
7 Days Left