Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3814432 |
|---|---|
| Organisation Name | Municipal Corporation |
| Tender Brief | Providing And Laying Of Synthetic Track At Munshi Ram Gupta Park Ward No.139, Karol Bagh, Rajinder Nagar Constituency (ac-39). |
| Last Date For Submission | 30th Mar, 2026 |
| Opening Date | 01 Apr, 2026 |
| Document Cost | 2360.00 |
|---|---|
| EMD | 206000.00 |
| Estimated Cost | 0.00 |
| City | Delhi |
|---|---|
| State | Delhi |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | PROVIDING & LAYING OF SYNTHETIC TRACK AT MUNSHI RAM GUPTA PARK WARD NO.139, KAROL BAGH, RAJINDER NAGAR CONSTITUENCY (AC-39). | ||
| 2 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 15.2.1 Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 264.14 | cum |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 66.04 | cum |
| 4 | PROVIDING AND LAYING IN POSITION CEMENT CONCRETE OF SPECIFIED GRADE EXCLUDING THE COST OF CENTERING AND SHUTTERING - ALL WORK UP TO PLINTH LEVEL :1:5:10 (1 CEMENT : 5 COARSE SAND (ZONE-III): 10 GRADED STONE AGGREGATE 40 MM NOMINAL SIZE) (AS PER DIRECTION OF OFFICER IN CHARGE.) | 82.55 | cum |
| 5 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). | 58.5 | cum |
5 Days Left