Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3700483 |
|---|---|
| Organisation Name | Police Housing Corporation Limited |
| Tender Brief | Corrigendum : Construction Of Parade Or Drill Ground At C.t.s., Musabani In The District Of East Singhbhum. |
| Last Date For Submission | 8th Apr, 2026 |
| Opening Date | 10 Apr, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 354000.00 |
| Estimated Cost | 17654502.00 |
| City | East Singhbhum |
|---|---|
| State | Jharkhand |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Parade Ground | ||
| 2 | 3.6(ii) Excavation in soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections and transporting to the embankment location within all lifts and lead upto 1000 m). | 2260.50 | Cum |
| 3 | 5.1.8 Filling in foundation trenches and plinth in layers. Not exceeding 150 mm thick well watered, rammed fully compacted and fine dressed with earth obtained after cutting within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I (Mode of measurement compacted volume) | 14483.93 | Cum |
| 4 | 2.03 (II) Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. | 0.37 | Ha |
| 5 | 3.20 Case - II Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. | 2260.50 | Cum. |
14 Days Left