Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3759150 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Janpad Etawah Isthit Prasidhha Pilua Hanuman Ji Mandir Ke Marg Par Bhavya Prawesh Dwar Aur Prakash Vyavstha Ka Karya |
| Last Date For Submission | 23rd Mar, 2026 |
| Opening Date | 23 Mar, 2026 |
| Document Cost | 944.00 |
|---|---|
| EMD | 330000.00 |
| Estimated Cost | 3300000.00 |
| City | Etawah |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in charge upto a distance of 30 M. from the foundation trenches. (where machine can not move) SI. No. 251 | 80.00 | Cum |
| 2 | Cement Concrete with 4 cm gauge approved stone grit, coarse sand & cement in the proportion of 6:3:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. SI. No. 279 b | 4.00 | Cum |
| 3 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing but excluding reinforcement and also including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. | 85.00 | Cum |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Thermo-Mechanically Treated bars of grade Fe-500D or more. | 13.00 | MT |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 370.00 | Sqm |
5 Days Left