Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3399247 |
|---|---|
| Organisation Name | Directorate Of Local Bodies |
| Tender Brief | Corrigendum : Construction Of Cc Tiles Road And Rcc L-type Drain From Sultan House To Sihali People House In Ward-05 Allipur. |
| Last Date For Submission | 23rd Mar, 2026 |
| Opening Date | 23 Mar, 2026 |
| Document Cost | 1120.00 |
|---|---|
| EMD | 73710.00 |
| Estimated Cost | 737075.00 |
| City | Gajraula |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil mixed with kankar, shigle etc. required special T&P also including lift up to 1.5 m and lead up to 30m and including filling waterning and ramming of excavated earth in to the trenches including all material labour, T&P, and all taxes for the proper Conpletion of the work as per direction of Engineer in charge.( Item No. 252 | 10.26 | Cum |
| 2 | M-150 brick work in 1:3 cement and coarse sand mortar in including all meterial, labour, and T&P etc for proper complection of the work.all meterial, labour, and T&P etc. required for proper completion of the work. (SI No 307) | 11.04 | Cum |
| 3 | Earthwork Construction of embankment with approved material obtained from borow pits with all lifts and leads trancporting upto 5 Km to sites, spreading, grading to required slope and compected as table 300.2.( As per rate analysis) | 189.00 | Cum |
| 4 | Cement Concrete with 2 cm guage stone grit instead 4cm guage stone ballastof fine sand of 1.25 F.M and cement in proportion of 1:2:4 in foundation and under floors and incliding supply of all meterial T&P and labour cess etc. as per direction of Engineer in charge.required for proper completion of the work. (SI No-279 A) | 0.33 | Cum |
| 5 | Construction of granular sub-base by providing well graded material Concrete work with 4cm. Guage brick ballast: fine sand of 1.25 F:M. and 5 Cement in proportion of 10:5:1 in foundation and under floors including 38.54 Cum 3350.00 supply of all meterials, labour and T&P etc. required for proper completion of work. ( Item No. 274) | 38.54 | Cum |
6 Days Left