Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3402040 |
|---|---|
| Organisation Name | Uttar Pradesh Power Transmission Corporation Limited |
| Tender Brief | Corrigendum : Civil Work For Construction Of 01 No. 33 Kv Bisnoli Bay At 132 Kv Sub-station Lalkuan Ghaziabad. |
| Last Date For Submission | 28th Mar, 2026 |
| Opening Date | 30 Mar, 2026 |
| Document Cost | 590.00 |
|---|---|
| EMD | 3000.00 |
| Estimated Cost | 0.00 |
| City | Ghaziabad |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) All kinds of soil including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. | 15.00 | CUM |
| 2 | Providing and laying in position cement concrete of specified grade 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources)excluding the cost of centering and shuttering - All work up to plinth level : | 1.45 | CUM |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1 :3 (1 Cement: 1 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) . | 4.50 | CUM |
| 4 | Providing and laying in position specified grade of reinforced cement concrete 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources), excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : | 2.65 | CUM |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 34.80 | SQM |
4 Days Left