Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Works Department
Tender ID3777616
Organisation NamePublic Works Department
Tender BriefConstruction of Budupur Bagharwara Link Road To Matiyara Link Road
Last Date For Submission24th Mar, 2026
Opening Date24 Mar, 2026
Cost
Document Cost2714.00
EMD447000.00
Estimated Cost4947000.00
Location
CityGhazipur
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (Including all taxes, labour cess etc but excluding GST)4000.00Cum
2Providing laying and spreading Material on a prepared sub grade, adding cement @ 2% by weight to the spread Material manually mixing in place with rotavator and compacting with the road roller and OMC to achieve the desired uncomfined compressive strength and to form a layer of sub-base. (Including all taxes, labour cess etc but excluding GST)434.50Cum
3Providing laying and spreading Material on a prepared sub base, cement @ 4% by weight to the spread Material manually mixing in place with rotavator and compacting with the road roller and OMC to achieve the desired uncomfined compressive strength and to form a layer of sub-base/base (Including all taxes, labour cess etc but excluding GST)412.50Cum
4Providing and applying Tack coat with bitumen (VG-10) using emulsion distributor at the rate of 0.30 kg per sqm on the prepared bitumen surface cleaned with Hydraulic broom as per Technical Specification clause 503. (Including all taxes, labour cess etc but excluding GST)4125.00Sqm.
5Providing laying and rolling of Open-graded premix surfacing of 20 mm compacted thickness composed of 13.20 mm to 11.20 mm sizes of aggregates mix Ratio 2:1 either using pnetration grade bitumen or emulsion to the required line grade and level to serve as wearing course on a previously prepared base. including mixing in a suitable plant, laying and rolling with a three smooth wheeled roller 80-100 tonne capacity, and finishing to required level as per Technical Specification clause 508. (Including all taxes, labour cess etc but excluding GST)4125.00Sqm.
24th Mar, 2026

4 Days Left