Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3800235 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Construction Of Karkapur Pasi Basti Link Road With 5 Year Maintenance |
| Last Date For Submission | 28th Mar, 2026 |
| Opening Date | 28 Mar, 2026 |
| Document Cost | 2714.00 |
|---|---|
| EMD | 632000.00 |
| Estimated Cost | 8650000.00 |
| City | Ghazipur |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from R.O.W. with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Including all material T&P, labour cess etc but excluding GST) | 5700.00 | Cum |
| 2 | Construction of granular sub-base by providing close graded material , spreading in uniform layers with motor grader on prepared surface , mixing by mix in place method with rotavator at OMC , and compacting with vibratory rollar to achieve the desired density , complete as per clause 401 (Including all material T&P, labour cess etc but excluding GST) | 620.00 | Cum |
| 3 | Providng & laying , spreading and compacting stone aggregates of specific sizes (45-63mm S.S.B.) to water bound macadam specification including spreading in uniform thickness , hand packing , rolling with smooth roller 80-100 KN in stage to proper grade and camber , applying and brooming , crushable screening to fill-up the interstices of coarse aggregate , watering and compacting to the require density grading 2 as per Technical Specification Clause 405.(Including all material T&P, labour cess etc but excluding GST) | 421.00 | Cum |
| 4 | Providng & laying , spreading and compacting stone aggregates of specific sizes (22.4-53 mm S.S.B) .to water bound macadam specification including spreading in uniform thickness , hand packing , rolling with smooth roller 80-100 KN in stage to proper grade and camber , applying and brooming , crushable screening to fill-up the interstices of coarse aggregate , watering and compacting to the require density grading 3 as per Technical Specification Clause 405.(Including all material T&P, labour cess etc but excluding GST) | 421.00 | Cum |
| 5 | Brick edging on both side of the road with 1st class bricks laid on edge with mud mortar including Cost of all labour materials T&P etc . Complete.(Including all material T&P, labour cess etc but excluding GST) | 1.50 | Km |
4 Days Left