Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: National Rural Employment Programme
Tender ID3782861
Organisation NameNational Rural Employment Programme
Tender BriefConstruction Of P.c.c Road From Health Sub Center To Noor Mohammad Jhar Vill Ghatiyari G. P. Ghatiyari Block Sunderpahari District Godda
Last Date For Submission2nd Apr, 2026
Opening Date04 Apr, 2026
Cost
Document Cost10000.00
EMD149000.00
Estimated Cost7404500.00
Location
CityGodda
StateJharkhand

Register to see full details

BOQ Items
#ItemQtyUnits
1Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.0.180Hecter
2Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-21698.300CUM
3Granular Sub-base with Well Graded Material (Table 400.1) By MIX in Place Method (Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per Technical Specification Clause 401.(iii) For Grading I Material494.100CUM
4Providing PCC M-200 in nominal mix of (1:1.5:3) in foundation and plinth with approved qality of stone chips 20mm to 6mm size graded and clean coarse of F.M 2.5 to 3 including ,mixing cement concrete in mixer and placing in position , vibrating, striking, curing,taxes and royality all complete as per building specification and direction of E/I.549.000CUM
5Centering and shuttering including strutting,proping etc and removal of form for foundation all complete as per direction of E/I.360.000SQM
2nd Apr, 2026

13 Days Left