| Tender ID | 3814741 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Construction Work Of 7x5 M Span Rcc Box Culvert On Sukhta Nala In Km-4 Of Chimna Nasauli Damar Road In District Hardoi In F.y. 2025-26 |
| Last Date For Submission | 30th Mar, 2026 |
| Opening Date | 30 Mar, 2026 |
| Document Cost | 2714.00 |
|---|---|
| EMD | 965000.00 |
| Estimated Cost | 0.00 |
| City | Hardoi |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in soil using hydraulic excavator and tipper with disposal upto 1000 m excavation for roadwork in soil with hydraulic excavator of 0.90 cum bucket capacity including cutting and loading in tipper, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-section and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per technical specification clause 302.3. (Including labour Cess Excluding G.S.T) | 630.00 | Cum |
| 2 | Construction of embankment with approved material obtained from availble land as permitted and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1, with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1and 300.2 as per Technical Specification clause 301.5 (Including labour Cess Excluding G.S.T) | 2200.00 | Cum |
| 3 | Dismantling of existing structures, like culverts, bridges, retaining wall and other structure comprising of brick masonary,including unerviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202. (Including labour Cess Excluding G.S.T) | 240.00 | Cum |
| 4 | Laying reinforced cement concrement pipe of 1000 mm Dia for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets (Including labour Cess Excluding G.S.T) | 75.00 | Rmt |
| 5 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.( Including labour Cess Excluding G.S.T) | 370.00 | Cum |