Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3473964 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Provision Of Special Items Of Variable Refrigerant Flow (vrf) Technology Based Ac Plants With All Connectd Equipment / Accessories And Reading Hall Furniture In Saraswathi Building At Dlrl Hyderabad |
| Last Date For Submission | 23rd Mar, 2026 |
| Opening Date | 25 Mar, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 234000.00 |
| Estimated Cost | 8968000.00 |
| City | Hyderabad |
|---|---|
| State | Telangana |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Note:- The contractor has to submit drawings for VRF duly showing design, layout and fixing details as per OEM/manufacturer s instructions within 20 days of commencement of work. This drawing has to be duly recommended by Engineer-in-charge & GE and got approved from SO1 of E4 section from HQ CE R&D Secunderabad before incorporation in the work | ||
| 2 | Supply, install, test & commissioning of TOP/SIDE DISCHRGE Air cooled Variable Refrigerant Volume / Flow (VRV/VRF) outdoor units (working and standby) with all inverter scroll compressor in each individual unit, preferbly all compressors of suitable capacity, air cooled copper condenser coils must have Ocien Black / Blue Fins coatings for corrosion resistance, condenser, fan motor shall be weather proof, brushless DC drive, fan shall have lower vibration, motor shall have minimum 10 steps and air flow resistance with protective grill, suitable for 380 -420 volts, 3 phase + N, 50 Hz, AC supply and shall deliver 100% capacity at 43 degree centrigrade temperature and shall be suitable for operation in upto 50 degree centigrade ambient without tripping or failure, minimum full load coefficient of performance (COP) must be 4.1 and minimum part load COP must be 7.2, defrost technology, 6 bypass valve compressor, including Regrigerant R-410A with first charge for refrigerant gas, suitable PCC foundations, including loading / unloading and shifting to floor / terrace and connecting earthing for outdoor units from the panel of following capacities / units, complete all as specified and directed. Note: Refrigerant gas suitable for VRV / VRF air conditioning plant shall be measured and paid separately under relevant item of Schedule. | ||
| 3 | 48 HP (Ground Floor Reading Hall 1 And Internet ) | 1.00 | Set |
| 4 | 18 HP(Ground Floor Tic Server Room And Office Room) | 1.00 | Set |
| 5 | 30 HP (First Floor Reading Hall II) | 1.00 | Set |
6 Days Left