Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3644879 |
|---|---|
| Organisation Name | Rajasthan Rajya Vidyut Prasaran Nigam Limited |
| Tender Brief | Corrigendum : Civil Work For 132 33kv 80 Mva Trf At 220 Kv Gss Sitapura |
| Last Date For Submission | 24th Mar, 2026 |
| Opening Date | 25 Mar, 2026 |
| Document Cost | 2950.00 |
|---|---|
| EMD | 55720.00 |
| Estimated Cost | 2786000.00 |
| City | Jaipur |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | 294.000 | cum |
| 2 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 28.000 | cum |
| 3 | Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. M20 grade Nominal Mix / Design Mix | 147.000 | cum |
| 4 | Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. | 728.000 | sqm |
| 5 | Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. ('Original producers' who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786)Thermo-mechanically Treated bars (Conforming of relevent IS code) | 4612.000 | Kg. |
4 Days Left