Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Rural Engineering Department
Tender ID3207660
Organisation NameRural Engineering Department
Tender BriefCorrigendum : 15- Gram Palra Block Bangra Main Ranjeet Singh Ke Makan Se Arvind Singh Ke Bade Hote Huye Arvind Singh Kushwaha Ke Nmakan Ki Aur Apex Sadak Abam Nali Nirman Karya.
Last Date For Submission2nd Apr, 2026
Opening Date02 Apr, 2026
Cost
Document Cost2354.00
EMD128000.00
Estimated Cost2552000.00
Location
CityJhansi
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in cutting in moorum mixed. soil (in Bundelkhand areas, requiring use of special T&P such as pick axes and sabbals etc.) excavation to be in the form of regular pits not exceeding 1/2 meter (20'') in depth including ramming and dressing the surface to required, levels and slopes and also including 1.5 m. (5ft), lifts and 30 m. (100ft) lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks within two km. distance including cost of royalty as directed by Engineer-in-charge648.210Cum
2Providing, laying spreading and compacting stone aggregates of specific sizes to water bound macadom specification including spreading in uniform thickness hand packing, rolling with smooth wheel roller 80 - 100 KN in stages to proper grade and camber, apploying and brooming, stone screening to fillup the interstices of coarse aggregate, watering and compacting to the required density .Grading 3 as per technical specification class 405165.530Cum
3Providing and Laying of 80 mm interlocking concrete block pavement laid in stone dust base and fill joint with fine sand. Joint filled after labling and dressing base including supply of all materails, labours, T&P etc required for proper completion of the site2206.900Cum
4Excavation in foundation in moorum mixed soil (in Bundelkhand area) including lift upto 1.5 m. and lead upto 30 m. and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge a distance of 30 m. from the foundation trenches.13.860Cum
5Cement concrete in 1:6:12 with cement, sand and (22.40-53) mm granite stone ballast (crusher broken) in foundation including supply of all materials, labours and T&P etc. required for proper completion of the work .6.940No.
2nd Apr, 2026

8 Days Left