| Tender ID | 3207702 |
|---|---|
| Organisation Name | Rural Engineering Department |
| Tender Brief | Corrigendum : 17- Gram Panchyat Sersa Block Moth Main Bhanupratap Singh Ke Makan Se Gopal Ke Makan Ki Aur Apex Sadak Abam Nali Ka Nirman Karya. |
| Last Date For Submission | 2nd Apr, 2026 |
| Opening Date | 02 Apr, 2026 |
| Document Cost | 854.00 |
|---|---|
| EMD | 45000.00 |
| Estimated Cost | 900000.00 |
| City | Jhansi |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Construction of granular sub base by providing well graded material, spriding in uniform layers with motor grader on prepared surface mixing by mix in place method with roatvetor at OMC .and compacting with smooth wheel roaller to achieve the desiersd density, complet as per technical specification Clause 400.1 | 71.300 | Cum |
| 2 | Providing and Laying of 80 mm interlocking concrete block pavement laid in stone dust base and fill joint with fine sand. Joint filled after labling and dressing base including supply of all materails, labours, T&P etc required for proper completion of the site | 713.000 | Cum |
| 3 | Excavation in foundation in moorum mixed soil (in Bundelkhand area) including lift upto 1.5 m. and lead upto 30 m. and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge a distance of 30 m. from the foundation trenches. | 14.490 | Cum |
| 4 | Cement concrete in 1:6:12 with cement, sand and (22.40-53) mm granite stone ballast (crusher broken) in foundation including supply of all materials, labours and T&P etc. required for proper completion of the work . | 10.870 | No. |
| 5 | M 150 brick work in 1:4 cement and fine sand of 1.25 F.M. mortar in foundation and plinth including supply of all materials, labours and T&P etc. required for proper completion of the work | 13.230 | Cum |