Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3207746 |
|---|---|
| Organisation Name | Rural Engineering Department |
| Tender Brief | Corrigendum : 1- Nagar Panchyat Moth Main Dr. Vinod Ke Makan Se Gaushala Ki Aur C.c Sadak Abam Nali Nirman Karya. |
| Last Date For Submission | 2nd Apr, 2026 |
| Opening Date | 02 Apr, 2026 |
| Document Cost | 2354.00 |
|---|---|
| EMD | 107000.00 |
| Estimated Cost | 2135000.00 |
| City | Jhansi |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Construction of granular sub base by providing well graded material, spriding in uniform layers with motor grader on prepared surface mixing by mix in place method with roatvetor at OMC .and compacting with smooth wheel roaller to achieve the desiersd density, complet as per technical specification Clause 400.1 | 122.500 | Cum |
| 2 | Construction of un-reinforce,and Expansion joint construction joints only pcc pavement thickness as per design over a prepared subbase, with 43 grade cement or any other type as clause 1501.2.2 m-30 grade coarse and fine aggregate confirming to is 383 maximum size of coarse aggregate not exeding 25 mm mixed in a concrete mixer of not less than 0.20 cum capacity and appropriate weigh batcher using approved mix design laid in approved fixed side formwork and fixing of 125 micron polytheen film including the levelling the formwork as per drawing spreading the concrete with shovel, rakes, compacting using needle, screed and plate vibraters and finished in continious operation including provision of contraction and expansion joints applying primer and curing compound and water finishing to lines and grade as per drawing and technical specification clause 1501. | 183.750 | Cum |
| 3 | Supply and fixing of sign board including painting and lettering as directed by Engineer-in-charge. | 1.000 | No. |
| 4 | Excavation in foundation in BC soil (in Bundelkhand area) including lift upto 1.5 m. and lead upto 30 m. and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge a distance of 30 m. from the foundation trenches. | 49.000 | Cum |
| 5 | Cement concrete in 1:6:12 with cement, sand and 22.40-53 mm granite stone ballast (crusher broken) in foundation including supply of all materials, labours and T&P etc. required for proper completion of the work . | 36.750 | Cum |
8 Days Left