Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Gorkhaland Territorial Administration
Tender ID3635903
Organisation NameGorkhaland Territorial Administration
Tender BriefCorrigendum : Construction Of Wall At Gitdabling Higher Secondary School, Gitdabling Gram Panchayat Under Lava Block, Kalimpong, Gta.
Last Date For Submission30th Mar, 2026
Opening Date01 Apr, 2026
Cost
Document Cost750.00
EMD7000.00
Estimated Cost350000.00
Location
CityKalimpong
StateWest Bengal

Register to see full details

BOQ Items
#ItemQtyUnits
1Earthwork in excavation of foundation trenches or drains in all sorts of soils including removing spreading or stacking the spoils within a lead of 75 m as directed including trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water etc. all complete. (a) Depth of excavation not exceeding 1.5 m.17.25Cu.M
2Earthwork in filling in foundation trenches or plinth with good earth in layers not exceeding 150 mm including watering and ramming etc. layer by layer complete.(a) With earth obtained from excavation of foundation.3.45Cu.M
3Plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any. (i) (1:3:6) proportion 67.16Cu.M
4Removal of rubbish,earth etc from the working site and disposal of the same beyond the compound in conforming with the Muncipality/Corporation Rules for such disposal,loading into trucks and cleaning the site in all respect as per direction of Enginner in Charge.4.878Cu M
5Hire and Labour charges for shuttering with centreing and necessary staging upto 4 m. using approved stoutprops and thick hard wood planks of approved thickness with required bracing for concrete slab, beams and columns,lintels curved or straight including fitting & fixing and striking out after completion of works (upto roof of ground floor). (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-in-Charge67.04Sq.M
30th Mar, 2026

5 Days Left