Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Works Department
Tender ID3778518
Organisation NamePublic Works Department
Tender BriefRampur Udaiyapur Link Road
Last Date For Submission25th Mar, 2026
Opening Date25 Mar, 2026
Cost
Document Cost2714.00
EMD600000.00
Estimated Cost8000000.00
Location
CityKannauj
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Construction of Embankment with mechanicaly compacted earth with approved material obtained from borrow pits with a lift upto 1.5m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 Engineer-in-charge as per MORD clause 3.4(301.5).7500.00Cum
2Providing, laying and spreading Material on a prepared sub base, cement @ 2% by weight to the spread Material, manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the compressive strength and to form a layer of sub-bas. Technical Specification clause . 4.1(405)592.00Cum
3Providing, laying and spreading Material on a prepared sub base, cement @ 4% (Cement Treated base, CTB by weight to the spread Material,manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer base. As per Technical Specification clause 4.1(405).787.00Cum
4Providing and applying Tack coat with bitumen VG-10 using pressure distributor at the rate of 0.35 kg per sqm on the prepared bituminous/granular surface treated with primer and cleaned with hydraulic broom as per Technical Specn. No. 5035625.00Sqm
5Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration or Emulsion grade bitumen to required line grade and level to serve as wearing course on a previously prepared base by manual means including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades to be followed by as per T.S.C. 5085625.00Sqm
25th Mar, 2026

5 Days Left