| Tender ID | 3778964 |
|---|---|
| Organisation Name | Municipal Bodies |
| Tender Brief | Special Repair Of Crematorium At Hundadwara Sahi In Ward No-02 |
| Last Date For Submission | 30th Mar, 2026 |
| Opening Date | 31 Mar, 2026 |
| Document Cost | 7080.00 |
|---|---|
| EMD | 34142.00 |
| Estimated Cost | 3414195.00 |
| City | Keonjhar |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard soil or Gravelly soil within 50 m initial lead & 1.50 m initial lift including levelling & dressing the bed & lifting the excavated materials within initial lead as per direction of Er. in Charge clear from work site with laying in layers of 0.30 m in depth , breaking the clod to maximum 5 to 7 cm in size & rough dressing the bed including cost of all labour etc. all complete . | 118.65 | cum |
| 2 | Carriage of Excavated earth by mechanical means with in 5km lead including loading and unloading with all cost Conveyance T&P sun dries etc.complete as per direction of Enggineer-in-charge. | 94.92 | cum |
| 3 | Filling sand in foundation & plinth well watered & rammed including cost , conveyance to site , royalty , cess DMF & EMF and additinol royalty etc all taxes of all materials & cost of all labour complete | 85.91 | cum |
| 4 | C.C. ( 1 :4;8) ) using 40 mm size hgcb metal free from weathered skin & all foreign materials including cost , conveyance to site , watering and curing,royalty , cess DMF & EMF and additinol royalty etc all taxes of all materials & cost of all labour complete | 72.26 | cum |
| 5 | R.C.C. work in (1:1.1/2:3)0Grade of concrete using 12 mm & down graded size hg chips including hoisting & laying the concrete, watering and curing etc. including cost of centering and shuttering for the work etc. all complete to required levels laid in layers including cost, conveyance to site , royalty , cess DMF & EMF and additinol royalty etc. all taxes of all materials & cost of all labour complete Base of Column | 31.72 | cum |