Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3646127 |
|---|---|
| Organisation Name | District Magistrate |
| Tender Brief | Corrigendum : Construction Of Temporary Pandals Including Barricading And Supply Of Any Other Materials Etc. As Required For The Work As Per Enclosed List For 1 No. Distribution-cum-receiving Centre At 157- Metiabruz Ac At Sister Nivedita Government General Colle |
| Last Date For Submission | 24th Mar, 2026 |
| Opening Date | 27 Mar, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 156771.00 |
| Estimated Cost | 7838561.00 |
| City | Kolkata |
|---|---|
| State | West Bengal |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Temporary Civil Works | ||
| 2 | Hire and labour charges for erecting temporary shed covered with waterproof tarpaulin over roof with strong bamboo/sal bullah frame resting on strong salbullah posts as per direction including maintenance as required (upto 10'0" min. ht.) roof should be projected upto 2'0" from all walling. (Payment will be made as per floor area). | 28574.000 | Sft. |
| 3 | Hire and labour charges for erecting temporary shed covered with waterproof tarpaulin over roof with strong bamboo/salbullah frame resting on strong salbullah posts including walling with water proof tarpaulin as per requirement and direction including maintenance as required (upto 10'0" min. ht.) Roof should be projected upto 2'0" from all walling. (Payment will be made as per floor area) | 26304.000 | Sft. |
| 4 | Hire and labour charges for erecting temporary shed covered with G.C.I. Tin roofing over strong salbullahpost and bamboo framing including fitting complete and walling with water proof tarpaulin (upto 10'0" ht. Min.) as per direction. Roof should be projected upto 2'0" from all walling (Payment will be made as per floor area). | 220.000 | Sft. |
| 5 | Hire and labour charges for erecting temporary shed covered with G.C.I. Tin roofing over strong salbullahpost and bamboo framing as per direction. Roof should be projected upto 2'0" from all walling (Payment will be made as per floor area). | 150.000 | Sft. |
4 Days Left