Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3799597 |
|---|---|
| Organisation Name | Kolkata Municipal Corporation |
| Tender Brief | Repairing Works Of Street Lighting Arrangement At Rang Badal Sangha And Other Areas In Ward No-98, Br-x. |
| Last Date For Submission | 27th Mar, 2026 |
| Opening Date | 27 Mar, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 3000.00 |
| Estimated Cost | 139346.00 |
| City | Kolkata |
|---|---|
| State | West Bengal |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | SCHEDULE OF RATES FOR EARTHING INSTALLATIONS.Earthing Installation ... with Pipe Electrode.Earthing with 50 mm dia GI pipe 3.64 mm thick x 3.04 Mts. long and 1 x 4 SWG GI (HOT Dip) wire (4 Mts. long), 13 mm dia x 80 mm long GI bolts, double nuts, double washers incl. S & F 15 mm dia GI pipe protection (1 Mts. long) to be filled with bitumen partly under the ground level and partly above ground level driven to an average depth of 3.65 Mts. below the ground level as below:(a)By ISI Medium GI pipe. | 20.000 | SET |
| 2 | SCHEDULE OF RATES FOR OVERHEAD LINE INSTALLATION - REPAIR 13. Providing CC (6:3:1) muffing 450x450x600 mm in size or equivalent size of cylindrical muffing above ground level around the pole base complete with 3 mm thick neatly finished cement plaster all round after dismantling the unserviceable muffing if any incl. fixing only loop box if necessary (a) Without Loop Box | 20.000 | EA |
| 3 | Painting steel tubular pole including projected arm bracket with one coat of red oxide primer and two coats with si lverlac AI. paint ete. (Scraping where necessary).Painting upto7 mtr Pole | 20.000 | EA |
| 4 | S/F arm bracket of 50 mm bore tubular Pipe (M.S.) of 1. 5 m (5') length for fixing on 75/100 mm pole top including S/F 4 mm thick M.S. plate welded with bolts, nuts & clamps, etc. as required with fabrication work | 20.000 | EA |
| 5 | S/F of special head type M S loop box (3 mm thick) with connecting bar and other accessories fixed on the top the pole as required and as per direction of Engineer-In-Charge. For 3 phase connection. | 20.000 | EA |
3 Days Left