| Tender ID | 3781737 |
|---|---|
| Organisation Name | Urban Improvement Trust |
| Tender Brief | Construction Of Singhdwar And Other Works Near Kansua Chouraha |
| Last Date For Submission | 23rd Mar, 2026 |
| Opening Date | 24 Mar, 2026 |
| Document Cost | 3500.00 |
|---|---|
| EMD | 171800.00 |
| Estimated Cost | 8590000.00 |
| City | Kota |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantling of Cement Concrete Pavements as per MoRTH Specification Clause 202. Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately | 74.00 | Cum |
| 2 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | 53.29 | Cum |
| 3 | Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains not exceeding 1.5 m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed with a lead in a 50 meter including stacking of useful material if available : Ordinary rock | 49.95 | Cum |
| 4 | Add extra over item no. 1.8 and 1.9 for every additional lift of 1.5 m or part thereof : In all kind of soils. | 50.00 | Cum |
| 5 | Providing and injection Chlopyrifous Emulsifiable concentrate 20% with 1% concentration for PRE-CONSTRUCTIONAL Anti termite treatment as per IS : 6313 part-III as amended from time to time and creating a continous chemical barrier under and arround the column pits, wall trenches, basement excavation, top surface of plinth filling, juction of wall and floor along the external perimeter of building expansion joints, over the top surface of consolidated earth of which aproch is to be laid surroundings of pipes and conduits etc. complete as per specification (Plinth floor area only shall be measured for payment). | 66.00 | sqm |